Consolidated Building Report
Visual Building Inspection · AS 4349.1 (General Spirit)

Consolidated Building Report.

152 Moverly Road, South Coogee NSW 2034 — Top (Northern) Townhouse
Subject dwelling
Top (northern) townhouse — the dwelling with the rectangular pool
Lot / Plan
Lot 4784, DP 752015
Inspection date
23 April 2026
Report version
v1 (Consolidated)
Levels inspected
Basement, Ground Floor, First Floor, Roof / Exterior
Photographs reviewed
244 images across 41 zones
Design drawings referenced: Graphio AM — Revision I, dated 10 August 2021 (CDC 3.00 Basement, CDC 4.00 Ground, CDC 5.00 First Floor, CDC 6.00 Roof)
Status: Consolidated — all four level assessments merged into a single document
Standard applied: AS 4349.1:2007 (general spirit), with express scope limits recorded at Section 2
Consolidated Building ReportPage 1 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 1 · At a glance

Executive Summary.

This consolidated report sets out the findings of a visual building inspection of the top (northern) townhouse at 152 Moverly Road, South Coogee. The inspection was performed from supplied photographs, supplemented by on-site confirmation for items expressly marked as confirmed on site.

Forty-two defect findings are recorded across the four levels. Six are Major. Thirteen are Moderate. The remaining twenty-three are Minor, Verification Required, or Monitor items.

Overall Assessment
Six Major Findings
Three confirmed life-safety or NCC-compliance items warrant immediate action: absent fire separation between Class 10a basement parking and the Class 1a dwelling (B7 / G12), pool barrier panels with excessive lateral flex (G3), and an unsealed vertical gap at the party wall between the two attached dwellings (R3). Three further findings (U1 gas cooktop commissioning, U11 / G11 water quality, U12 Master Suite ventilation) require verification or commissioning steps before occupancy.
Major Moderate Minor Verification required

Major findings — priority actions (6 items)

Major · Confirmed non-compliance

B7 / G12 — Fire separation basement-to-dwelling absent

No FRL 60/60/60 separating construction between Class 10a basement parking and the Class 1a dwelling. No compliant self-closing solid-core doors or fire-rated lift landing doors. Breaches NCC HP H6D1 / H6D2.

Photos p1140576, p1140582 · p.5 & p.7

Major · Life safety

G3 — Pool barrier glass panels flex excessively

Base-spigot-mounted glass panels without a continuous top rail show significant lateral deflection under manual load. Inconsistent with AS 1288 retention requirements for top-rail-less systems.

Photos p1140688, p1140696 · p.7

Major · Fire + weather

R3 — Unsealed party wall gap

Continuous vertical gap (30–50+ mm visual estimate) between the two rendered party walls. No expansion joint filler, sealant, or flashing. Compromises the FRL of the separating wall and weatherproofing at the junction.

Photos p1140799, p1140800 · p.8

Major · Commissioning

U1 — Kitchen gas cooktop not commissioned

Burner heads fitted, control knobs loose on benchtop, no rangehood captured in photographs, no visible commissioning documentation. Gas Compliance Certificate required from a licensed gasfitter before use.

Photos p1140652, p1140655, p1140666, p1140683 · p.6

Major · Weatherproofing

B1 — Exposed membrane termination (basement)

Exposed black waterproofing membrane with honeycombed concrete surround and soil / backfill in direct contact at the horizontal construction joint of the basement retaining wall.

Photo p1140558 · p.5

Major (tbc) · Habitability

U12 — Master Suite natural ventilation

Fixed floor-to-ceiling glazing combined with a small openable window that "barely opens". Suspected non-compliance with NCC HP H4D5 (≥5 % unobstructed openable area). Site measurement required.

Master Suite (site verification) · p.6

Summary by level

LevelFindingsMajorModerateMinor / Verify
Basement (B1 – B7)7232
Upper / First Floor (U1 – U12)121 (+2 tbc)45
Ground Floor (G1 – G13)1323 (+1 tbc)7
Roof / Exterior (R1 – R10)10136
Total42613 – 1420
What we recommend next Commission the builder / developer in writing on the three confirmed Major items (B7 / G12, G3, R3) under the statutory warranty provisions of the Home Building Act 1989 (NSW). Engage a Fire Safety Engineer or registered building certifier, an accredited NSW Pool Barrier Certifier, a licensed gasfitter, and a NATA-accredited laboratory for the water-quality sample. Do not occupy the cooktop or use the pool until the Major items are resolved.
Section 1 — Executive SummaryPage 2 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 2 · Scope

Scope, Methodology and Limits.

This inspection was performed on a visual, non-intrusive basis. Findings are based on what could be observed from supplied photographs, supplemented by on-site confirmation where expressly noted.

The assessment flags items that are visually evident or that, on the balance of what the photographs show, warrant further investigation by a suitably qualified specialist. Each finding cites the Australian Standard, NCC provision, or legislative reference that applies.

2.1 Items expressly outside the scope of this inspection

Not within scope

  • Intrusive inspection of concealed elements (membranes behind finishes, reinforcement within concrete)
  • Moisture-meter readings
  • Electrical testing or compliance verification under AS/NZS 3000:2018
  • Lift certification under the AS 1735 series
  • Structural-capacity calculations
  • Thermal / BASIX performance verification

Separate specialist scopes

  • Termite inspection (Timber Pest Inspection per AS 4349.3 is a separate scope)
  • Pool compliance certification (see scope disclaimer 1, Section 3)
  • Roof specialist inspection (see scope disclaimer 2, Section 3)
  • Fire Safety Engineer's written assessment of NCC HP H6D1 compliance
  • NATA-accredited laboratory water testing
  • Pendulum slip-resistance testing (AS 4586:2013)

2.2 Photographic basis

A total of 244 photographs (p1140514 and p1140558 – p1140800) were reviewed. Photos were taken in the sequence: Basement → Upper Level (First Floor) → Ground Floor → Exterior. The photos have been allocated to 41 zones across the four levels. Where a zone is marked as confirmed by full-resolution review it is identified with [C]; inferred zones are marked [I] and should be verified on site.

2.3 Standard applied

This inspection has been carried out in the general spirit of AS 4349.1:2007 Inspection of buildings — Pre-purchase inspections — Residential buildings, while explicitly noting the scope limits above. Where a specific standard or provision of the NCC is engaged by a finding, that reference appears in the finding itself.

2.4 Note on below-ground waterproofing standards

Australia does not have a dedicated AS Standard for below-ground / tanking membranes equivalent to AS 3740 (internal wet areas) or AS 4654.2 (external above-ground). Below-ground waterproofing is governed by:

Section 2 — Scope, Methodology and LimitsPage 3 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 3 · Disclaimers

Scope Disclaimers — Specialist Inspections Required.

Two classes of element are expressly outside the scope of a general building inspection and require separate inspection by a qualified specialist.

Disclaimer 1 — Pool and pool barrier

The building inspector is not a licensed pool specialist and this report does not constitute a pool or pool-barrier compliance certificate. Any observations on the pool, pool barrier, coping, water recirculation, or poolside electrical / bonding are indicative only and are subject to inspection and certification by an accredited NSW Pool Barrier Certifier (AS 1926.1 / 1926.2), a licensed pool builder / technician (AS 1926.3), and a licensed electrician for poolside RCD / equipotential bonding (AS/NZS 3000 Section 7.5). The pool must be registered on the NSW Swimming Pool Register with a current Certificate of Compliance before use.

Disclaimer 2 — Roof, roof covering, roof plumbing and concealed roof structure

The building inspector is not a licensed roofing contractor and this report does not constitute a roof specialist report. The roof covering, box gutters, parapet cappings, flashings, rainwater heads, sumps, overflow provision and concealed roof structure were not inspected from above. Visible roof-edge observations and findings affecting the rooftop deck are provided on an advisory basis only. A full specialist inspection by a licensed roofing contractor and / or roof plumber is required under AS/NZS 3500.3:2021, AS 4654.2:2012 and NCC HP Part 7.5 before any reliance is placed on the roof condition.

Property details

Property address152 Moverly Road, South Coogee NSW 2034
Subject dwellingTop (northern) townhouse — the dwelling with the rectangular pool
Lot / PlanLot 4784, DP 752015
Design drawingsGraphio AM — Revision I, dated 10 August 2021 (CDC 3.00 Basement, CDC 4.00 Ground, CDC 5.00 First Floor, CDC 6.00 Roof)
Levels inspectedBasement (RL 62.400–62.550), Ground Floor (RL 65.200–65.300), First Floor (RL 68.350–68.850), Roof / Exterior
Photographs reviewed244 images (p1140514, p1140558 – p1140800) across 41 zones on 4 levels
Report statusConsolidated — all four level assessments merged into a single document
Section 3 — Scope DisclaimersPage 4 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 8 · Scannable summary

Consolidated Defect Register.

All 42 findings sorted by severity. Major   Moderate   Minor   Verify / Monitor.

Major findings (6 items)

RefPhotoDefect / ItemSeverity
B1p1140558Unfinished / exposed membrane termination, honeycombed concrete at basement retaining wallMajor
B7p1140576, p1140582Fire separation between basement (Class 10a) and dwelling (Class 1a) — absent on siteMajor — confirmed non-compliance
G3p1140696, p1140688Glass pool barrier — excessive lateral flex, base-mounted without top rail — replacement recommendedMajor
G12(cross-ref B7)Fire separation to basement parking — absent on site (Ground Floor side cross-reference)Major — confirmed non-compliance
R3p1140799, p1140800Unsealed vertical gap between dwellings at party wall — fire and weatherproofingMajor
U1p1140652, p1140655, p1140666, p1140683Gas cooktop install incomplete / rangehood not confirmedMajor (tbc)

Moderate findings (13 items)

RefPhotoDefect / ItemSeverity
B2p1140559Historic moisture staining in service / bonding riserModerate
B4p1140571Crack in polished concrete slab (basement parking)Moderate (tbc)
B5p1140575Rust through painted external door jamb; render crackModerate
G1p1140641, p1140642Extensive render map cracking (external)Moderate to Major
G2p1140636Damaged render at window / door jambModerate
G7p1140698Unfinished penetration at pool / garden services (render + exposed cabling)Moderate
G11p1140731Yellow / amber water in Ground Floor toilet (see U11)Moderate (tbc)
R4p1140785Crack at render-to-paving junctionModerate
R8p1140797, p1140798A/C condenser — foliage obstruction + unfinished render at service penetrationModerate
U5p1140670Window / door head junction gapModerate
U8p1140627Glass balustrade panel gap — verifyModerate (tbc)
U11p1140588, p1140613, p1140731Yellow / amber water in all toilet pans — dwelling-wideModerate (tbc)
U12Master Suite — siteMaster Suite ventilation — fixed glazing + small openable window; AC does not substituteModerate–Major (tbc)
This register is a scan-friendly aggregation. The full narrative for each finding appears in the relevant level section (Sections 4–7).
Section 8 — Consolidated Defect RegisterPage 5 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 8 · continued

Defect Register — Minor, Verify, Monitor (23 items).

RefPhotoDefect / ItemSeverity
B3p1140563Worn concrete around drainage grateMinor
B6p1140567, p1140568Iron staining on subsoil drain (agi-drain)Monitor
U2p1140653Unsealed cabinet base penetration (waste hose)Minor
U3p1140607Window safety device — key left in lockOperational
U4p1140589Skylight perimeter finish unevenMinor
U6p1140604Construction debris at carpet / joinery junctionMinor
U7p1140595, p1140596Carpet stainingMinor
U9p1140634Balcony balustrade — height / glass grade verifyVerify
U10p1140609Master Ensuite waterproofing / glazing / GPO — verifyVerify
G4p1140688, p1140696Pool barrier gaps (panel-to-panel, base, top) — verifyVerify
G5Pool gate — location, self-closing, latch height — verifyVerify
G6p1140701Pool waterline staining / debrisMinor (maintenance)
G8p1140739, p1140740Stair soffit / ceiling finish incompleteMinor
G9p1140730Bathroom GPO zone position — verifyVerify
G10p1140681, p1140689Timber deck — slip resistance and framing verifyVerify
G13Ground Floor further investigation checklistVarious
R1p1140707, p1140708, p1140726Debris / standing water at rooftop skylight surroundsMinor (maintenance)
R2p1140792, p1140793Roof covering, box gutters, parapet cappings, flashings — not inspectedNot determined
R5p1140787, p1140788Render surface unevenness (raking light)Minor–Moderate
R6p1140791Balustrade post-to-capping corrosion / finish breakdownMinor–Moderate
R7p1140758, p1140789Incomplete external doors — jamb junction and missing handleMinor
R9p1140786Front entry stair — geometry / slip / handrail verifyVerify
R10p1140789Soffit-wall junction — crack vs detail — verifyVerify
Section 8 — Defect RegisterPage 6 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 4 · Findings

Level 1 — Basement.

7 findings · 29 photos

Basement level (RL 62.400 – 62.550). Photos reviewed: p1140558 – p1140586. Basement photos were taken in sequence starting at the carpark vehicular entrance and moving through the space toward the far (eastern) end. Seven findings are recorded, two of which are Major.

4.1 Basement zone map

ZonePhotosKey findings
1. Carpark entrance — threshold, retaining wall, bonding cabinet558 [C], 559 [C], 560 [C], 562 [C]B1 membrane termination; B2 bonding riser staining
2. External drainage grate at entrance563 [C]B3 worn concrete surround
3. Subsoil / agi-drain perimeter run566 [I], 567 [C], 568 [C]B6 iron staining on agi-drain
4. Carpark floor — polished concrete parking bay561–565, 570–572B4 crack in polished slab (571)
5. Carpark perimeter — pebble drainage channel573 [C], 574 [I]Continuous channel — visually compliant
6. External basement door (side access)575 [C], 576 [C]B5 rust through jamb; render crack
7. Transition: Parking bay → Lift lobby569 [C], 579 [C]Polished concrete to tile junction
8. Lift lobby — tiled floor, floor drain577, 578, 580 [C], 581Lobby drainage; ceiling pipework
9. Lift shaft / lift car interior582 [C], 583 [C], 584–586B7 cross-reference — no fire-rated landing doors
B1 Exposed / unfinished waterproofing termination to basement retaining wall Major
Photos: p1140558  ·  Location: Basement retaining wall — upper edge / horizontal construction joint with upper slab
Observation

Exposed black waterproofing membrane / sheet visible with unrendered concrete surround. Surrounding concrete shows honeycombing (voids where aggregate is not properly encased in paste). Soil / backfill material is visible against the unfinished concrete; the protective cover to the membrane termination is absent.

Applicable standards
Recommendation

Refer to the building's consulting engineer. Make good the honeycombed concrete; reinstate protective cover / flashing to the membrane termination in accordance with the manufacturer's installation details; verify membrane continuity. Photograph during rectification.

B2Evidence of past moisture in service riser / bonding enclosureModerate
Photos: p1140559  ·  Location: Basement service riser — marked 'BONDING' with dimension markings 350 / 1500
Observation

Historic moisture staining / efflorescence pattern visible on galvanised panel and adjacent pipe. Streaked staining down the pipe is consistent with prior water tracking. No active water observed.

Recommendation

Investigate source (above-slab penetrations, waterproofing at service chase, pipe joint integrity). Confirm that any affected electrical equipment is rated for the exposure it has experienced; verify the integrity of equipotential bonding (licensed electrician scope). Standards engaged: AS/NZS 3000:2018 Sections 4 and 6; NCC HP Part 7.5.

B3Worn / pitted concrete surround at external drainage grateMinor
Photos: p1140563  ·  Location: External drainage pit at basement level

Exposed-aggregate concrete surrounding the grate shows pitting, wear and minor spalling. Organic debris accumulated in the pit. Recommendation: make good the damaged concrete surround; confirm the grate is securely retained and of the appropriate class; schedule regular cleaning. Standards: AS/NZS 3500.3:2021; AS 3996:2019.

B4Crack in polished concrete floor slab (basement parking)Moderate (tbc)
Photos: p1140571  ·  Location: Basement parking floor — polished concrete finish

A visible crack runs across the polished slab. Width cannot be measured from the photograph; appears to be in excess of a hairline (>0.3 mm). The crack is approximately linear, consistent either with an uncontrolled drying-shrinkage crack or a crack at an inadequate control joint. Recommendation: measure the crack width with a crack-width gauge; install a tell-tale monitor and observe over 3 – 6 months. If >0.3 mm and stable, consider epoxy injection. If active or >1.0 mm, engage a structural engineer. Standards: AS 3600:2018; AS 2870:2011; NCC HP Part 4.2.

B5Rust staining at external basement door jamb; render crack at junctionModerate
Photos: p1140575  ·  Location: External doorway at basement level

Rust-coloured staining bleeding through the painted door jamb finish, consistent with corrosion of embedded steel, fixings or a steel lintel behind the paint. A crack / gap is visible at the render-to-jamb interface. Recommendation: strip back paint at the affected area; identify and remediate the corroding element; apply a paint system complying with AS/NZS 2312.1 for the exposure class; re-seal the render / jamb junction. Standards: AS/NZS 2312.1:2014; AS 3700:2018; NCC HP Part 7.5.

B6Iron staining on subsoil drainage (agi-drain)Monitor
Photos: p1140567, p1140568  ·  Location: Basement perimeter — visible length of flexible corrugated subsoil drain

The agi-drain exhibits significant rust-coloured staining along its length, consistent with iron-rich groundwater passing through the drain. Indicates drainage is actively working; iron ochre build-up can reduce flow over time. Recommendation: note for future maintenance. Schedule periodic inspection / flushing of the subsoil drain system to prevent iron ochre blockage. Consider CCTV inspection of buried sections after several years' service. Standards: AS/NZS 3500.3:2021; AS 2439.1:2007.

B7Fire-resistant separation between basement parking (Class 10a) and dwelling (Class 1a) — absent on siteMajor — non-compliance
Photos: p1140576, p1140582 (basement lift lobby / lift interior), and adjacent Ground Floor transition photos
Observation — confirmed on site

There is no fire-resistant separating wall installed between the basement parking (Class 10a) and the Ground Floor dwelling (Class 1a). Inspection confirmed the absence of the required separating construction — there is no FRL 60/60/60 wall, no masonry alternative, and no tight-fitting self-closing solid-core door at any of the transitions (stair head, lift landing, or any other doorway). The basement and the Ground Floor are effectively open to each other via the spiral stair and lift shaft.

Applicable standards (breached)
Implications for the purchaser
Recommendation
  1. Obtain written confirmation from a registered Fire Safety Engineer or registered building certifier that this dwelling does not comply with NCC HP H6D1. A Performance Solution may be negotiable but requires formal assessment.
  2. Raise the non-compliance with the builder / developer in writing under the statutory warranty provisions of the Home Building Act 1989 (NSW).
  3. Rectification scope to quote: FRL 60/60/60 separating construction at every point where the basement parking meets the Class 1a dwelling; tight-fitting self-closing solid-core doors (≥ 35 mm) at every opening; AS 1735.11 fire-rated lift landing doors.
  4. Interim risk management: do not store fuel, LPG cylinders or lithium-ion batteries (including e-bikes / e-scooters) in the basement; install interconnected smoke alarms in the basement as well as habitable areas; install a CO monitor at the stair head.
  5. Document the defect: retain this report, dated photographs, and all builder / certifier correspondence. Material evidence if the matter progresses to NSW Fair Trading, NCAT or civil claim.
Section 4 — Level 1 BasementPage 7 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 5 · Findings

Level 2 — Upper Level / First Floor.

12 findings · ~87 photos

First Floor / Upper Level (RL 68.350 – 68.850). Photos reviewed: p1140587 – p1140635 and p1140647 – p1140684. Rooms inspected: Master Suite, Walk-In Robe, Master Ensuite, WC, Kitchen, Pantry, Dining, Living, Balcony and Planters, Spiral Stair (upper flight). Twelve findings are recorded, of which U1 is Major and U12 is Major-to-be-confirmed.

5.1 Upper Level zone map

ZonePhotosKey findings
U-W1. Central WC (powder room)587 [C]Powder room adjacent to stair head — fluted floating basin
U-W2. Master Ensuite588–594, 609–613U11 yellow water (588, 613); U4 skylight finish (589); U10 waterproofing / glazing
U-W3. Walk-In Robe595–600U7 carpet staining (595, 596)
U-W4. Master Suite bedroom601–608, 614–626U3 window child-safety key (607); U6 carpet debris (604); U12 ventilation
U-W5. Master Suite Balcony627–635U8 balustrade panel gap (627); U9 balcony balustrade verify (634)
U-E1. Stair head / switch panels647 [C], 648Touch-screen smart-switch panel
U-E2. Pantry649–651Scullery off Kitchen — built-in shelving
U-E3. Kitchen652–658U1 cooktop install / rangehood tbc (652); U2 cabinet penetration (653)
U-E4. Dining659–665Access to dining balcony; timber flooring
U-E5. Living Room666–676U5 window / door head junction gap (670)
U-E6. East Balcony677–684Glass balustrade; planter on east edge
U1Kitchen gas cooktop — installation appears incomplete at time of inspectionMajor (tbc)
Photos: p1140652, p1140655, p1140666, p1140683  ·  Location: Kitchen — row of four modular gas burners set into stone benchtop

Burner heads and trivets fitted into the benchtop; control knobs shown loose on the benchtop; manufacturer packaging visible alongside. No rangehood captured in the photographs above the cooktop. Commissioning documentation not visible.

Recommendation

Obtain a Gas Compliance Plate / Certificate from the licensed gasfitter for the cooktop installation. Confirm installation of rangehood or equivalent mechanical exhaust venting externally per NCC 10.6. Verify accessible gas isolation valve within reach of the cooktop per AS/NZS 5601.1. The cooktop should not be used until these items are confirmed.

Standards

AS/NZS 5601.1:2022 Gas installations; AS/NZS 1668.2:2012 ventilation; NCC 2022 HP Part 10.6.

U2Unsealed penetration through kitchen / sink cabinet baseMinor
Photos: p1140653 (and p1140654)  ·  Location: Under-sink cabinet — base plate

Flexible corrugated waste hose (consistent with dishwasher drain) passes through a roughly-cut oversized opening in the cabinet base. Gaps around the hose are unsealed. A second penetration is also visible. Recommendation: seal penetrations with a rodent-proof flexible sealant collar. Confirm dishwasher drain has proper air-break or high-loop installation to prevent back-siphonage per AS/NZS 3500.2.

U3Window child-safety device — key left in engaged positionOperational
Photo: p1140607  ·  Location: Openable window to Master Suite area

Key-operated window restrictor device installed on the window frame. Blue key shown inserted in the lock at the time of photograph. Device is installed (compliant) but leaving the key defeats the purpose of the child-safety restrictor. Recommendation: remove the key from the lock during normal use and store inaccessible to young children. No physical rectification required. Standards: NCC HP Part 7.1; AS 5203:2018; Strata Schemes Management Act 2015 (NSW) s.118.

U4Skylight frame / ceiling interface — uneven finishMinor
Photo: p1140589  ·  Location: Ceiling of Master Suite area — black-framed fixed skylight

Paint / cornice edge along the skylight frame is uneven and shows patchy setting compound. Small gap visible between the frame and the adjacent ceiling lining in places. External flashing cannot be assessed from the photograph. Recommendation: make good the plasterboard and paint at the skylight perimeter to a Level 4 finish per AS 2589.1. Standards: AS 4285:2017; NCC HP Part 7.5; AS 2589.1:2017.

U5Window / door frame head junction — visible gap between frame sectionsModerate
Photo: p1140670  ·  Location: Head of window / sliding door unit

The two meeting sections of the bronze aluminium frame show a visible misalignment / gap at the mitre / butt junction. Fixing screw visible. No bead of sealant evident in the gap — potential water / air ingress path at a weatherline junction. Recommendation: seal the frame junction with appropriate neutral-cure silicone sealant. If misalignment is structural (fixing issue), re-fix the frame. Verify across all window / door frames in the dwelling. Standards: AS 2047:2014; AS 4773.1:2015; NCC HP Part 7.5.

U6Finishing / workmanship — construction debris at carpet / wall junctionMinor
Photo: p1140604  ·  Location: Carpeted room (likely Master Suite or WIR)

Loose plaster dust / setting compound debris at the carpet edge and on the adjacent wall. Joinery / jamb edge shows raw, unfinished timber at the bottom where it meets the carpet. Recommendation: thorough site clean; make good joinery edge at carpet transition; consider carpet-clean. Standards: AS 2455.1:2019; AS 1884:2021.

U7Carpet stainingMinor
Photos: p1140595, p1140596  ·  Location: Carpeted area — likely Master Suite or WIR

Yellow / amber staining visible on the wool loop-pile carpet in several locations. Recommendation: professional carpet clean. If the stain does not lift, investigate source (possible plaster contamination during finishing) and patch-replace the affected section if necessary.

U8Glass balustrade / screen — gap dimension between panels requires measurementModerate (tbc)
Photo: p1140627  ·  Location: Close-up of glass balustrade (balcony or stair at First Floor)

Vertical gap between adjacent glass panels visible. Width cannot be measured from the photograph. Top rail present (positive compliance signal). If any gap exceeds 125 mm this is a non-compliance. Recommendation: measure all panel-to-panel gaps. Any gap > 125 mm to be closed (gasket / spacer / replacement panel). Verify glass is Grade A safety glazing carrying the AS/NZS 2208 / AS 1288 certification mark. Standards: NCC HP Part 7.5; AS 1170.1:2002; AS 1288:2021; AS/NZS 2208:1996.

U9Balcony balustrade glass — general compliance check requiredVisual OK — verify
Photo: p1140634 (balcony overview)  ·  Location: First Floor balcony — full-height glass panel balustrade with continuous black top rail

Framed glass balustrade with top rail. Height and panel dimensions appear adequate from the wide view but cannot be measured. Recommendation: site-measure top of handrail to balcony floor level to confirm ≥ 1000 mm. Confirm glass is Grade A safety, verify panel thickness against AS 1288 tables for the height and span, retain installer's compliance certificate. Standards: NCC HP Part 7.5; AS 1170.1:2002; AS 1288:2021; AS/NZS 2208:1996.

U10Master Ensuite — items requiring further investigationVerify
Photos: p1140609 (bath, vanity, floor drain), p1140587 (WC adjacent)  ·  Location: Master Ensuite and adjoining WC

Finished wet areas with freestanding bath, natural stone vanity top, large-format tiled floor, linear channel drain in shower zone, square floor waste outside shower zone, highlight window above bath. GPOs visible above vanity (reflected in mirror). Appearance generally satisfactory but compliance items cannot be verified from photographs alone. Recommendation: obtain the waterproofing compliance certificate (AS 3740). Verify GPO clearance from basin (not in Zone 1). Test mechanical exhaust operation. Verify highlight window above bath is Grade A safety glazing. Standards: AS 3740:2021; AS 3958.1:2007; AS 1288:2021; AS/NZS 3000:2018 Section 6; NCC HP Part 10.6.

Section 5 — Upper Level · continued on p.9Page 8 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 5 · continued

Upper Level — water quality & ventilation.

U11Yellow / amber water observed in all toilet pans — dwelling-wide water supply observationModerate (tbc)
Photos (this level): p1140588 (Master Ensuite WC — yellow water with a brown streak down the back of the bowl), p1140613 (Master Ensuite toilet — same yellow water)  ·  Cross-ref: p1140731 (Ground Floor Bathroom toilet — same finding, recorded as G11)
Observation

All toilet pans photographed across the dwelling show water of a distinct yellow / amber colour, consistent between levels. A brown vertical stain is visible on the rear inside surface of the bowl in p1140588 — characteristic of iron deposition over time (not just temporarily stagnant water). The consistency suggests a dwelling-wide water supply quality issue, not a single stagnant bowl. This may be associated with the iron staining at the basement subsoil drain (finding B6) — both pointing toward iron-bearing water on or near the property.

Applicable standards
Recommendation
  1. Flush every fixture (taps and toilets) for at least 5 – 10 minutes to clear stagnant / commissioning water; re-observe after several normal-use cycles.
  2. If discolouration persists, engage a licensed plumber to inspect supply line materials (cold, hot, rising main from meter) for any galvanised components and confirm compliance with AS/NZS 3500.1:2021.
  3. Take a sample from the cold tap nearest the meter and have it tested by a NATA-accredited laboratory for iron (total), manganese, turbidity and colour against the Australian Drinking Water Guidelines.
  4. Inspect each cistern internally for visible corrosion of the inlet valve or internal components.
  5. Verify there is no cross-connection with tank water or non-potable services (pool top-up, irrigation).
U12Master Suite natural ventilation — fixed floor-to-ceiling glazing with only a small openable window — non-compliance suspectedModerate–Major (tbc)
To confirm on site: Master Suite glazing / window elements  ·  Location: Master Suite — Upper Level / First Floor
Observation

The main wall of glass in the Master Suite is fixed (not openable) and contributes zero to the ventilation opening area. The only openable window has a very limited operating range ("barely opens"), providing only a small fraction of its nominal frame area as unobstructed openable area. A standard residential split-system air conditioner recirculates air within the room and does not satisfy the NCC natural-ventilation requirement or an AS 1668.2 mechanical ventilation alternative.

Applicable standards
Recommendation
  1. Measure on site: Master Suite floor area (m²); the unobstructed openable area of every openable element (small window, balcony sliding door, any other device) when fully open. Sum all openable areas and express as a percentage of floor area.
  2. If the calculated openable area is less than 5% of the floor area: modify the fixed glazing or the small window to provide a compliant openable area (for example, replace the small window with a larger awning, casement or bifold; or make a section of the currently-fixed glazing openable); or install a compliant AS 1668.2 mechanical ventilation system.
  3. Independently of the 5% calculation, advise the occupier that sleeping in a bedroom with limited openable ventilation and large cold-glazed surfaces increases condensation and mould risk. Recommend opening the balcony sliding door (if present) regularly for cross-ventilation.
  4. If the balcony sliding door is the Master Suite's primary emergency egress, consider whether the bedroom meets modern expectations for a secondary means of escape — raise separately with the builder / Fire Safety Engineer.
Section 5 — Upper Level U11, U12Page 9 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 6 · Findings

Level 3 — Ground Floor.

13 findings · 15 zones

Ground Floor (RL 65.200 – 65.300). Photos reviewed: p1140636 – p1140646 (external perimeter) and p1140685 – p1140766 (interior and pool). Zones inspected: external perimeter and drainage; Pool and Pool Barrier; Entertaining Area / Deck / Lawn; Entry; Guest Bedroom and Guest Ensuite; Bathroom; Laundry; Study Nook; Living Room; Corridor.

Scope note

The pool-related findings in this section (G3 – G7) are recorded subject to the pool specialist disclaimer at Section 3.1. A Certificate of Compliance from an accredited NSW Pool Barrier Certifier is required before pool use.

6.1 Ground Floor zone map (abridged — 15 zones total, see full register for photo ranges)

ZonePhotosKey findings
EXT-1. External perimeter / side façade636 [C], 637–646G2 render damage at jamb (636); G1 render map cracking (640–642)
1. Pool enclosure — glass balustrade685–697G3 pool barrier excessive lateral flex (696); G4 gaps verify
2. Pool services — tap, conduit, grate698 [C], 699G7 unfinished render at pool services penetration (698)
3. Pool interior — water / steps / waterline700 [C], 701 [C]G6 waterline staining
6. Spiral stair / Lift (central)711–713, 717–720, 739–741G8 spiral stair soffit finish
10. Ground Floor Bathroom / WC730 [C], 731 [C]G9 GPO zone; G11 yellow water in toilet pan
G1Extensive map cracking / crazing to external renderModerate to Major
Photos: p1140641, p1140642 (and p1140640 for context)  ·  Location: External render to wall / pilaster at Ground Floor perimeter (west / pool side)

Widespread network of fine cracks ('map cracking' / 'crazing') across an area of the render finish. Two visible render chips where the coating has broken away, with cracks radiating from the chip edges. Distributed across most of the affected area — not localised. Recommendation: engage a specialist rendering contractor for a full survey of all external render. Remove and reinstate affected areas per AS 3700 and the render manufacturer's specification. Investigate underlying cause (over-gauged cement-rich mix, substrate movement, inadequate joints). Standards: AS 3700:2018; AS 4773.1:2015; NCC HP Part 7.5; AS 4548.4:2011.

G2Damaged render at external window / door frame jambModerate
Photos: p1140636, p1140637  ·  Location: External rendered wall adjacent to bronze aluminium sliding door / window jamb

Render is chipped and broken away at the base of the frame jamb, exposing the substrate. The junction between render and frame is not finished / not sealed — direct water ingress path at a weatherline. Recommendation: make good the damaged render; apply a neutral-cure silicone flexible sealant at the frame-to-render junction; verify the frame flashing / weather lip behind the render is continuous. Standards: AS 2047:2014; NCC HP Part 7.5; AS 3700:2018.

G3Glass pool barrier panels (pool-side) exhibit excessive lateral flex — primary defect on this levelMajor — life safety
Photos: p1140688 (overall), p1140696 (inspector physically flexing a panel, showing visible lateral deflection)  ·  Location: Ground Floor pool area — west side; rectangular pool with integrated plunge / spa
Observation

The glass pool barrier panels are fixed to the deck via small base spigots (brand: Minrell) with no continuous top rail on the pool-side panels. Under manual load applied to the panel face, the panels show significant lateral flex (p1140696). This is inconsistent with AS 1288 retention requirements for non-top-rail systems — monolithic toughened glass panels fixed by point fixings / spigots generally require a continuous top rail unless a recognised non-top-rail system is installed and certified under an accredited scheme (AGGA E1).

Applicable standards
Recommendation

Replace with an E1-certified base-mounted glass balustrade / pool-fence system (independently accredited under the AGGA Glass Balustrade Accreditation Scheme to Energy Class E1). Verify:

G4Pool barrier — panel-to-panel and base gap verification requiredVerify
Photos: p1140688 (overall), p1140696 (in-situ flex test)  ·  Location: Pool barrier — multiple panel junctions around the pool perimeter

Gaps between adjacent glass panels, and between the bottom of the panels and the decking, cannot be reliably measured from the photographs. Recommendation: during the site visit accompanying G3 rectification, measure every panel-to-panel gap and every panel base clearance with a calibrated gauge (100 mm go/no-go). Record and remediate any non-compliant dimensions. Standards: AS 1926.1:2012 cl. 2.4, 2.5, 2.6.

G5Pool perimeter gate — presence, latch height and self-closing mechanism to confirmVerify
Photos: None of the supplied photos show a dedicated pool gate clearly  ·  Location: Pool enclosure access — to be identified on site

A compliant pool enclosure requires a self-closing, self-latching gate opening outwards from the pool, with latch release mechanism ≥ 1500 mm from finished surface on the outside, or shielded so that it cannot be reached from outside through a 10 mm opening within 450 mm. Recommendation: photograph and measure the pool enclosure gate(s). Verify compliance with all Section 3 requirements of AS 1926.1:2012.

G6Pool waterline — surface staining and floating debris (maintenance)Minor (maintenance)
Photos: p1140701 (pool interior with ladder), p1140688  ·  Location: Pool interior — mosaic tile at waterline, pool floor and ladder

Brown / yellow staining visible at the waterline mosaic tile. Floating organic debris in the water. Water clarity slightly reduced. Recommendation: commission the pool (clean, balance chemistry, confirm filtration cycle). Provide handover documentation. Standards: AS 1926.3:2010.

G7Pool / garden services — unfinished penetration through render at hose / pipe exitModerate
Photo: p1140698  ·  Location: Base of external rendered wall at pool perimeter — hose tap, discharge PVC pipe, and stormwater / pool drain grate

Render at the base of the wall where the PVC pipe exits is damaged / not made good. Coloured wires / cables are visible protruding from a horizontal construction joint in the render at approximately 400 mm AFFL. Hose tap on braided blue hose. PVC pipe discharges onto a stormwater grate set in the lawn. Recommendation: engage the builder to make good the render around the pipe penetration, seal around pipe and cabling with flexible sealant, and verify exposed cables are adequately protected and terminated in a weather-rated enclosure. Confirm dual-check valve fitted at the hose tap. Confirm pool backwash discharge is directed to sewer or legal stormwater point per local council requirements. Standards: AS/NZS 3500.1:2021; AS/NZS 3500.3:2021; AS 1926.3:2010; AS/NZS 3000:2018; NCC HP Part 7.5.

Section 6 — Ground Floor · G1–G7Page 10 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 6 · continued + Section 7

Ground Floor G8 – G13 & Roof / Exterior.

G8Spiral stair soffit / ceiling finish — incomplete / touch-up visibleMinor
Photos: p1140739, p1140740, p1140741  ·  Location: Ground Floor — soffit / underside of spiral stair as it rises to First Floor

Underside / soffit along the stair void shows areas of partially-painted setting compound, a pale-green paint blob or primer patch, and a visible junction line between two surfaces not finished flush. Recommendation: make good plasterboard and paint to a Level 4 finish at the stair soffit per AS 2589.1:2017.

G9Ground Floor Bathroom — GPO position near shower / vanity to be verifiedVerify
Photos: p1140730, p1140731  ·  Location: Ground Floor main bathroom — wall behind / adjacent to toilet shows a double GPO

Modern bathroom with frameless glass shower enclosure, wall-hung vanity, square floor waste. GPO visible on the wall behind / above the toilet, in close proximity to the glass shower enclosure. Recommendation: verify on site that the GPO is outside Zones 0, 1 and 2 (generally ≥ 1.8 m horizontal distance from the shower head outlet). If within Zone 2, confirm it is IP-rated and RCD-protected. Electrician's certificate to be sighted. Standards: AS/NZS 3000:2018 Section 6.2 (Bathrooms); AS 3740:2021.

G10Pool decking (timber) — general inspection and review requiredVerify
Photos: p1140681, p1140689, p1140691, p1140697  ·  Location: Ground Floor — timber decking surrounding the pool and across the entertaining area

Hardwood timber decking boards on a deck frame system. Board spacing and fixings appear regular from photographs. Recommendation: confirm deck framing, fixings, bearer / joist details by reference to construction records or by lifting a board. Verify slip resistance in wet conditions — target P3 (or R10) for external wet-exposed surfaces; consider anti-slip treatment if below classification. Standards: AS 1684.2:2021; AS 1170.1:2002; AS 1657:2018; AS 4586:2013.

G11Yellow / amber water in Ground Floor Bathroom toilet — see dwelling-wide finding U11Moderate (see U11)
Photo: p1140731

Water in the toilet pan shows a distinct yellow / amber colour, matching the condition observed in both Upper Level toilets (p1140588 and p1140613). Dwelling-wide finding recorded in full under U11. Recommendation: see U11 — flush all fixtures; if discolouration persists, engage a licensed plumber to verify supply line material compliance with AS/NZS 3500.1:2021; NATA-accredited laboratory sample test.

G12Fire separation to basement parking — absent on site (Ground Floor cross-reference)Major — non-compliance
Photos: top of spiral stair landing, Ground Floor lift landing door, any internal doorway between Ground Floor and basement lift lobby  ·  Location: Ground Floor side of the separating floor and walls between the dwelling and the basement parking

Same finding as B7, documented here as a cross-reference for the Ground Floor scope. The required FRL 60/60/60 separation, masonry alternative, and tight-fitting self-closing solid-core doors are all absent. The basement and Ground Floor are effectively open to each other via the spiral stair and lift shaft. Recommendation: see B7 for full rectification scope, implications for the purchaser, and interim risk-management actions. Rectification must cover the Ground Floor side of the separation (floor slab, stair-head enclosure, lift landing door) in addition to the basement side.

G13Ground Floor — further investigation requiredVarious

The following Ground Floor items could not be verified from the photographs supplied and require further inspection:

Section 6 — Ground Floor G8–G13Page 11 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 7 · Findings

Level 4 — Roof, Exterior, Façade and Services.

10 findings · R3 Major

Scope of this level: Roof (limited viewpoints), Skylight wells at rooftop, Parapets and Cappings, Exterior Façade, Front Entry and Stairs, Driveway, Balustrades to external landings and stairs, Services (mechanical A/C condensers, external plumbing). Photos reviewed: p1140707 – p1140708 and p1140726 (skylights from above); p1140767 – p1140800 (exterior and services); p1140792 – p1140793 (roof edge from below). Ten findings, of which R3 is Major.

Scope note

The roof-related findings in this section (R1, R2, and any observations of the roof surface or roof plumbing) are recorded subject to the roof specialist disclaimer at Section 3.2. A specialist roofing contractor / roof plumber inspection is required.

R1Debris and standing water visible on rooftop deck adjacent to skylightsMinor (maintenance)
Photos: p1140707, p1140708, p1140726  ·  Location: Roof level — rooftop deck / terrace area where skylights are set into the paved roof with pebble surround

Skylight glazing with surrounding white aluminium frame set into a stone / paved deck. Organic debris (leaves, twigs, grit) visible on the deck near the skylights. Areas of residual surface water / damp staining visible. Pebble bed in adjoining roof-planter area contains leaf litter. Pooling water adjacent to a skylight flashing is a known leak entry path. Recommendation: clean all debris from rooftop deck and pebble beds. Verify roof falls correctly to nominated drainage point(s) and no ponding exists once cleared. Refer to roof plumber for flashing and drainage assessment per Section 3.2 disclaimer. Standards: AS/NZS 3500.3:2021; AS 4285:2017; NCC HP Part 7.5.

R2Roof covering / membrane, box gutters, parapet cappings, flashings — not inspectedNot determined
Photos: p1140792, p1140793 (views upward from balcony / ground showing roof edge, parapet, single surface-fixed downpipe)  ·  Location: Roof generally

Only limited oblique views of the parapet edge and a single surface-fixed downpipe are visible. The roof surface, waterproofing, box gutters, overflows, rainwater heads, any sumps and flashings at parapet cappings, HVAC penetrations, skylights and service vents have not been inspected. Recommendation: engage a licensed roofing contractor and / or roof plumber for a specialist inspection under the roof disclaimer at Section 3.2. Standards: AS/NZS 3500.3:2021; AS/NZS 2904:1995; NCC HP Part 7.5; AS 4654.2:2012.

R3Unsealed gap between dwellings at party wall / side boundaryMajor — fire + weather
Photos: p1140799, p1140800  ·  Location: Vertical separation between the subject townhouse and the adjoining dwelling — continuous vertical open gap between the two rendered wall surfaces
Observation

A substantial vertical gap (visual estimate 30 – 50+ mm, to be measured on site) runs between the two rendered walls. The gap is open top-to-bottom from what can be seen; no expansion joint filler, no sealant, no flashing cover strip is visible. Cobwebs inside the gap suggest the condition has existed for an extended period. The apparent absence of any fire-rated jointing at the party wall compromises both weatherproofing of the separating wall detail AND fire separation between the two attached Class 1a dwellings.

Applicable standards
Recommendation

Engage a building consultant / structural engineer to inspect the separating wall detail on site. The gap should be filled with a tested and certified fire-resistant expansion joint system complying with AS 4072.1 to match the FRL of the separating wall, with a weatherproof flashing / cover strip at the top and sides. Approved products typically combine a ceramic fibre / mineral wool backing with a fire-rated mastic. Retain the installer's FRL certification.

R4Separation / crack at render wall to external paving junctionModerate
Photo: p1140785  ·  Location: External paved area at Ground Floor — junction between rendered wall and stone tile flooring

Visible gap / crack at the interface between the base of the rendered wall and the stone paving, running along the wall line — direct water ingress path at a horizontal junction which will progress if not sealed. Recommendation: clean out the junction, apply a compressible backer rod, and seal with a neutral-cure silicone sealant suitable for exterior stone / render. Verify the waterproof membrane beneath the paving is continuous against the wall up-stand. Standards: AS 3958.1:2007; AS 4654.2:2012; NCC HP Part 7.5.

R5Render surface unevenness / bulging revealed by raking lightMinor–Moderate
Photos: p1140787, p1140788  ·  Location: External rendered wall near secondary entry / storage door

Inspector's torch used at a shallow angle across the render reveals unevenness — a bulge and associated irregularities. Typical raking-light method used to identify imperfect float work or partial delamination of render. Minor unless accompanied by a hollow sound — in which case Moderate (render has lost adhesion and must be removed and re-rendered). Recommendation: sound-test flagged areas by tapping. Where hollow, remove loose render back to a sound edge, key the substrate, and re-render per the original specification. Standards: AS 3700:2018; AS 4773.1:2015.

Section 7 — Roof / Exterior · R1–R5Page 12 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 7 · continued

Roof / Exterior — R6 to R10.

R6Balustrade post-to-capping junction — corrosion / finish breakdownMinor–Moderate
Photo: p1140791  ·  Location: External balustrade to front entry / approach — steel rectangular posts set into stone capping over a rendered wall

Whitish compound residue and what appears to be the beginning of rust staining at the base of one or more balustrade posts where they meet the stone capping. Coating / paint finish shows early breakdown. Concern is progressive loss of section at the post base reducing barrier capacity over time. Recommendation: clean the post / capping junction, verify post fixings are sound, strip back flaking coating, treat any corrosion, and recoat with a paint system appropriate to coastal exposure (likely C5-M given proximity to the coast) per AS/NZS 2312.1:2014. Seal the post-to-capping junction with a neutral-cure sealant. Standards: AS/NZS 2312.1:2014; AS/NZS 4680:2006; AS 1170.1:2002; NCC HP Part 7.5.

R7External doors — incomplete finishing / hardwareMinor (practical completion)
Photos: p1140758 (jamb base with unfinished render), p1140789 (storage door without handle)  ·  Location: Secondary / storage external doors at Ground Floor level

Unsealed junction between bronze aluminium door frame and rendered wall at the base of the jamb (p1140758). Storage door appears fitted but without a door handle installed (p1140789), only a strike plate visible. Recommendation: complete frame-to-render junction with flexible sealant. Install missing door handle / lockset. Verify door is fully weather-sealed (brush / rubber seal at head, jambs and threshold). Standards: AS 2047:2014; AS 5039:2008 / AS 5040:2003; NCC HP Parts 9.4 and 7.5.

R8Mechanical (Daikin VRV) A/C condenser — foliage obstruction and unfinished render at service penetrationsModerate
Photos: p1140797, p1140798  ·  Location: External side / garden zone — Daikin VRV IV inverter condenser unit (R410A refrigerant)

Large tropical plants (Strelitzia / 'giant bird of paradise') growing directly against the condenser, obstructing airflow to the intake. Service penetration through the render adjacent to the unit — orange conduit (refrigerant line cover) and blue cable visible — render around the penetration not made good; substrate visible. Plant matter in close proximity to service penetrations and cables. Plant obstruction reduces condenser efficiency, risks short-cycling and premature compressor failure; unfinished penetration is a combined weatherproofing, cable-protection and pest-entry issue. Recommendation: cut back or relocate plants to provide clearances specified in the Daikin installation manual (sight the manual). Engage the builder to make good the render around the service penetration and seal with UV-stable flexible sealant. Engage a licensed HVAC technician and a licensed electrician to verify installation compliance with AS/NZS 3823 and AS/NZS 3000 respectively. Standards: AS/NZS 3823; AS/NZS 1677.1 / 1677.2:1998; AS/NZS 3000:2018; NCC HP Part 7.5.

R9Front entry stair — geometry, slip resistance and handrail compliance to verifyVerify
Photo: p1140786  ·  Location: External front entry stair — stone tiled treads and risers, rendered planter walls, step-riser LED lights, metal top handrail

Stair well-presented with LED step lighting. Compliance items that cannot be measured from the photograph: consistent going and riser dimensions (NCC: rise 115 – 190 mm, going 240 – 355 mm, dimensional variation ±5 mm between treads); slip resistance of the stone tile nosings under wet conditions; handrail height and continuity; any required balustrade / barrier where fall height > 1 m. Recommendation: on site, measure rise and going of each tread, confirm consistency per NCC 11.2. Obtain slip-resistance classification for the stone tread (supplier documentation) or have a pendulum test performed per AS 4586. Measure handrail height; confirm balustrade height where fall exceeds 1 m. Standards: NCC HP Part 11.2; AS 4586:2013; NCC HP Part 7.5; AS 1170.1:2002.

R10Soffit to external stair landing — visible crack / junction lineVerify
Photo: p1140789  ·  Location: External side courtyard — soffit under the staircase running to the upper landing

Horizontal line visible along the soffit-to-wall junction. Could be a compliant shadow-line / control-joint detail, or a shrinkage / movement crack. Cannot be distinguished from the photograph alone. Recommendation: inspect the junction on site. If control-joint shadow-line, the item can be dismissed; if a crack, measure width, install a monitor and monitor for progression; if active or > 0.3 mm, refer to a structural engineer. Standards: AS 3600:2018; AS 2870:2011; NCC HP Part 7.5.

Section 7 — Roof / Exterior R6–R10Page 13 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Section 9 · Action plan

Priority Actions and Recommendations.

The following action plan groups the 42 findings into priority tiers. Priority is set by the combination of life-safety risk, NCC compliance exposure, and cost / difficulty of rectification. Tier 1 and Tier 2 items should be addressed before occupancy or during a conveyancing / price-negotiation process.

Tier 1 · Immediate action — life safety & confirmed NCC non-compliance

Resolve before pool use, cooktop use, or occupancy

Tier 2 · Address before occupancy or during settlement

Moderate items with meaningful compliance or habitability exposure

Tier 3 · Verifications to complete

On-site measurement or documentation required before a final compliance position

Tier 4 · Finishing / cosmetic

Minor items for defect-liability / handover — do not affect compliance

Section 9 — Priority ActionsPage 14 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Sections 10 & 11

Further Investigation & Items In Order.

10. Further investigation and specialist reports required

The following items are outside the scope of this visual inspection and require engagement of a suitably qualified specialist. Receipts / certificates from these specialists should be retained on the property file.

Fire safety and compliance

  • Fire Safety Engineer or registered building certifier — written assessment of NCC HP H6D1 (B7 / G12) and of the party-wall FRL breach at R3
  • Certified installer — fire-resistant expansion joint to AS 4072.1 at party wall (R3)
  • Lift contractor — fire-rated landing doors to AS 1735.11 at basement-to-Ground Floor interface
  • Smoke alarm installer — verify hard-wired interconnected alarms per AS 3786:2014 on all levels

Pool and water services

  • Accredited NSW Pool Barrier Certifier — AS 1926.1 / 1926.2 assessment; Certificate of Compliance; NSW Pool Register (G3 – G5)
  • Licensed pool builder / pool technician — pool structure, plant, chemistry, poolside RCDs per AS/NZS 3000 Section 7.5
  • Licensed plumber — supply-line material audit (U11 / G11); sample testing against Australian Drinking Water Guidelines
  • Licensed plumber — dual-check valve at hose tap (G7); pool backwash discharge compliance

Roof and roof plumbing

  • Licensed roofing contractor / roof plumber — specialist inspection of roof covering, box gutters, parapet cappings, flashings and concealed roof structure (R2 and all items subject to the roof disclaimer)
  • Water test of box gutters, overflows, rainwater heads and downpipes to AS/NZS 3500.3:2021

Structural and concrete

  • Consulting structural engineer — basement retaining wall waterproofing / concrete make-good (B1)
  • Structural engineer — basement slab crack assessment if width > 0.3 mm or active (B4)
  • Structural engineer — external stair soffit junction (R10) if confirmed as a crack

Electrical and HVAC

  • Licensed electrician — wet-area GPO zone compliance at U10 and G9; external cable protection (G7, R8); RCD coverage verification
  • Licensed HVAC technician — Daikin VRV compliance against installation manual and AS/NZS 3823 (R8)

Other specialists

  • Licensed gasfitter — Gas Compliance Certificate for cooktop (U1)
  • Specialist rendering contractor — external render survey and rectification (G1, R5)
  • Waterproofing contractor — AS 3740:2021 compliance certificates for wet areas (U10, G13)
  • Termite management inspection to AS 3660.1:2014 (separate scope under AS 4349.3)
  • Pendulum slip-resistance test (AS 4586:2013) on timber deck (G10) and external stair (R9)
  • Moisture-meter survey of walls adjacent to B1 and B2
  • NATA-accredited laboratory water test (U11 / G11)

11. Items visually compliant / in order

The following items were inspected from photographs and appeared satisfactory on visual review. Intrusive inspection or testing may be required to confirm. This list is provided for completeness — it does not constitute a warranty of compliance.

Basement

  • Perimeter pebble / subsoil drainage channel — continuous around basement perimeter (p1140566, p1140573, p1140574, p1140580)
  • Polished concrete finish to basement floor (general — notwithstanding crack at B4)
  • Downlight installation in basement store / lobby (no obvious unsealed penetrations — p1140580)
  • Lift installation — lift control panel and car interior in-service (p1140582, p1140585, p1140586)
  • Drainage pipework on soffit / ceiling — visible routing consistent with design intent (p1140581)

Upper Level / First Floor

  • Freestanding bath, stone vanity and fluted joinery to Master Ensuite (p1140609)
  • WC installation with wall-hung pan and concealed cistern (p1140587, p1140588)
  • Large-format floor tile installation, even joints, linear and point drains (p1140609)
  • Balcony glass balustrade with continuous top rail (p1140634)
  • Stone benchtop to Kitchen (p1140652, p1140655, p1140661)
  • Internal timber flooring general (p1140650, p1140651)
  • Carpet installation general — ignoring U6 / U7 (p1140594, p1140611)
  • Spiral stair (upper flight) appearance (p1140671, p1140672)
  • Window / sliding door assembly junctions general — with exception U5 (p1140667, p1140668)

Ground Floor

  • Ground Floor main bathroom layout: frameless glass shower, wall-hung vanity with fluted front, square floor waste, wall-hung WC (p1140730, p1140731)
  • Laundry bench with sink, concealed tap (p1140714, p1140715)
  • Travertine stone feature wall with floating stone shelf / console — Living Room (p1140749, p1140750)
  • Timber flooring installation general (p1140702, p1140721, p1140760)
  • Carpet installation in bedrooms (p1140711, p1140725, p1140728, p1140729)
  • Spiral stair tread profile from underneath — subject to G8 (p1140716, p1140739 – p1140741)
  • Pool water recirculation — return / skimmer evident (p1140701)
  • Lift interior — ground lobby (p1140762)
  • Pool ladder / grab-rail installation within pool (p1140701)

Roof / Exterior / Services

  • Adjacent neighbouring dwelling (No. 150 — 2-storey brick and weatherboard) visible at boundary — not part of subject scope
  • External rendered finish to most visible exterior walls — subject to G1 and R5
  • Downpipe installation (surface-fixed, visible in p1140793) — routing and fixing acceptable pending roof plumber inspection
  • Driveway and front entry approach layout (p1140782)
  • Balustrade design overall — subject to fixing base condition per R6
  • LED step lights to external stair (p1140786) — illumination provided
  • Skylight glazing integrity — visible from both sides, no cracks observed
Sections 10 & 11 — Further Investigation & Visually CompliantPage 15 of 16
Consolidated Building Report152 Moverly Road · 23 April 2026
Sections 12 & 13

General Compliance Notes & Closing.

12.1 Design drawing notes to verify

The following notes are drawn from the Graphio AM Revision I design drawings and the general NCC framework. They are not findings against the dwelling but provide context for the purchaser and for any rectification scope.

12.2 Applicable standards and legislation summary

The following standards and legislation are engaged by one or more findings in this report. This list is indicative — each finding cites the standards that apply to it.

ReferenceSubject matter
NCC 2022 Volume 2 HPParts H4D5 (natural ventilation), H6D1 / H6D2 (garage separation), 7.1 (window safety), 7.5 (weatherproofing), 9.3 (separating walls), 10.6 (ventilation), 11.2 (stairs)
AS 3740:2021Waterproofing of domestic wet areas (U10, G13)
AS 1926.1 / .2 / .3Swimming pool safety: barriers, spa pools, water recirculation (G3 – G7)
AS 1288:2021 / AS/NZS 2208:1996Glass in buildings; safety glazing (G3, U8, U9, U10)
AS 1530.4 / AS 4072.1 / AS 1905.1 / AS 1735.11Fire resistance, joint fillers, fire-resistant doorsets, fire-rated lift landing doors
AS/NZS 3000:2018Wiring Rules — Section 6 (wet areas), Section 7.5 (poolside), general (B2, U2, U10, G9, R8)
AS/NZS 3500.1 / .2 / .3 :2021Plumbing and drainage — water, sanitary, stormwater (U2, U11, G7, R1)
AS 3700:2018 / AS 4773.1:2015Masonry structures and rendering (B5, G1, G2, R5)
AS 3600:2018 / AS 2870:2011Concrete structures; residential slabs and footings (B1, B4, R10)
AS/NZS 5601.1:2022Gas installations (U1)
AS 2047:2014 / AS 4285:2017Windows and external glazed doors; skylights (U5, G2, R7, U4, R1)
Home Building Act 1989 (NSW)Statutory warranty — 6 years for major defects, 2 years for other defects (B7 / G12, G3, R3)
Swimming Pools Act 1992 / Regulation 2018 (NSW)Pool barrier certification and NSW Swimming Pool Register (G3)
Plumbing and Drainage Act 2011 (NSW)Plumber licensing (pool and roof scope references)

13. Closing statement

This consolidated building report sets out 42 findings across the four levels of the top (northern) townhouse at 152 Moverly Road, South Coogee, based on visual review of 244 photographs and on-site confirmation for those items expressly marked as confirmed. The findings are recorded against the applicable provisions of the NCC 2022 Housing Provisions and the relevant Australian Standards in force at the date of this report.

Three findings — B7 / G12 (fire separation), G3 (pool barrier) and R3 (party wall gap) — are Major items that in the inspector's view warrant immediate attention. U1 (gas cooktop), U11 / G11 (water quality) and U12 (Master Suite ventilation) require verification or commissioning steps before occupancy.

The report has been prepared under the general scope of AS 4349.1:2007 (Pre-purchase inspection — residential buildings), with express scope limitations recorded in Section 2 and specialist disclaimers in Section 3. Nothing in this report should be construed as a certificate of compliance, a pool barrier certificate, a roofing specialist report, a structural engineer's report, or a fire safety engineer's report — each of those is a separate specialist scope and is referenced where relevant.

For the purchaser This report is intended to support informed decision-making during conveyancing and handover. The findings at Tiers 1 and 2 in Section 9 should be considered material to any price negotiation or rectification commitment; the verifications in Tier 3 should be completed before occupancy or as soon as practicable thereafter.
For the builder / developer Findings B7 / G12, G3 and R3 are raised under the statutory warranty provisions of the Home Building Act 1989 (NSW). The inspector's written finding is provided to the purchaser; responses and rectification proposals should be returned in writing.
— End of consolidated building report —
Sections 12 & 13 — Compliance Notes & ClosingPage 16 of 16